CONSULTATION DEADLINE · 25 OCTOBER 2026Make your voice heard
Home Update · 5 October 2026Update · 5 October 2026

The October consultation: what to read, and why it matters

The official early ideas are available. Read the source, understand the stage of the project and prepare your own response.

A decision is still ahead

Royal Docks Waterways has published Royal Victoria Floating Residential — Early ideas, dated October 2026. The document describes a feasibility study led by Haptic Architects and Gort Scott, so that Royal Docks Waterways can decide in 2027 if and how to proceed.

This is early engagement, not an announcement of planning approval. The illustrations are conceptual.

What the material includes

The ideas include residential moorings, floating homes, shared facilities and an extended public boardwalk. The document envisages homes of 1–3 storeys and a mixture of boats and purpose-built homes that can change over time. It also sets out environmental and safety intentions.

Read the official October 2026 PDF.

The official project FAQ, checked on 5 October, gives approximately 100 units as an indicative possibility if something like the current illustrations went ahead, and says nothing has been decided. It is not a confirmed maximum.

Read the official project page and FAQs.

Our campaign’s position

We support sensible regeneration and more homes in appropriate locations. We oppose permanent residential development within Royal Victoria Dock's open water. The proposed improvements should be weighed against alternatives that retain the open basin.

Our case distinguishes the official intentions, our concerns and what we want demonstrated. Please read both sides before forming your view.

Read our case and the questions we want answered.

Have your say in your own words

At the time of this update, the official feedback period runs from 5 to 25 October 2026. The sources specify the date, not a precise closing time. Submit early rather than relying on the final evening.

Our consultation guide shows the current deadline status and offers a response-writing tool. Your draft remains in your browser until you choose to copy it. Nothing is submitted automatically.

This is a dated update. Check the consultation guide and official website for the current position.

← All campaign updates
A dock worth speaking up for

Keep Royal Victoria
Dock open.

Read the evidence. Form your view. Make it heard.

Consultation & next steps